A backfill volume of approximately 65,000 cubic metres of material ise required to close off the 3.2 kilometres of tunnels that comprise the civil air defence facility under and around Jiefang Lu in Wuxi, at a cost of ¥18 million, leaving fond memories. Full story (in Chinese) via this link; read lots more of the latest news from Wuxi via this link.