The main part of the Bridge was successfully close at 14:18 on 3 April, with the last of 110 segments, weighing 267 tonnes, accurately hoisted into place. The 5.8-kilometre long project remains projected to open before the end of the year. Full story (in Chinese) via this link; read about Nanjing introduced as never before via this link.