Conventional construction was ruled out given the densely intertwined section of the water network in Xinghua City; the helicopter was brought in on 24 September to assist with the erection of the 220 kV tower over Changrong Town. Full story (in Chinese) via this link; read lots more of the latest news from Taizhou via this link.