Opened on 31 January, the 30.4-km long Line S1, with a maximum design speed of 120 km/h, operates between Jiangyin Bund on the bank of the Yangtze in the north and Yanqiao in Huishan District in the south. Full story (in Chinese) via this link; read the absolute essentials about Wuxi via this link.



