10.99km long with eight stations, the Line, fully automated with GoA4 technology, links up with its northern and southern sections. Upon opening, all stations along the route will be in operation, initially excepting Yingtian Avenue and Mufu Xi Lu. Full story (in Chinese) via this link; read about Nanjing introduced as never before via this link.