With the capability for crew to directly transfer to and from wind turbines, the “Zhizhen 100” has completed 3 days of tests off the Nantong coast. Being taller than other ships, its wind farm maintenance operational window is widened. Full story (in Chinese) via this link; read the absolute essentials about Nantong via this link.